Thursday, March 31, 2011

The Sarnia Road bridge is on the move

The CP rail bridge was been lifted off its foundations over the CP Rail line between Hyde Park Road and Wonderland Road Thursday.
The 50,000 lb., steel-truss, one-lane bridge, in place since 1909, was lifted out of the way by crane.
The new railway crossing is expected to be finished in the fall.
The one-lane bridge was blamed for frequent bottlenecks.